Mercedes-Benz EQC Is Three Months Behind Schedule

Share with your Friends
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  

Developed to tackle the Audi e-tron quattro, the EQC from Mercedes-Benz is greater than meets the attention. It’s additionally greater than the GLC-Class, which can obtain a mid-cycle refresh this March on the 2019 Geneva Motor Present. On the draw back, the three-pointed begin postponed the launch of the EQC in Eu… (proceed studying >>)

Share with your Friends
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
TOP NEWS  McLaren 720S Face Swap for Toyota 86 Seems Like a Finances Supercar